[{"data":1,"prerenderedAt":326},["ShallowReactive",2],{"page:\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F":3,"nav:en":255},{"kind":4,"locale":5,"path":6,"alternates":7,"seo":11,"breadcrumbs":17,"jsonld":26,"data":169,"dims":251},"blog","en","\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F",{"tr":8,"en":6,"ar":9,"ru":10},"\u002Fblog\u002Fkentsel-donusum-sureci-adim-adim-ne-kadar-surer\u002F","\u002Far\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F","\u002Fru\u002Fblog\u002Fetapy-gorodskoy-renovatsii-v-turtsii\u002F",{"title":12,"description":13,"image":14,"canonical":6,"type":15,"published":16,"modified":16},"Urban Transformation Process in Turkey: Steps and Timeline","How does urban transformation work in Turkey and how long does it take? Nine steps from the risky building assessment and majority decision to permit…","\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-ates-sitesi-img-03.jpg","article","2026-10-01",[18,21,24],{"text":19,"href":20},"Home","\u002Fen\u002F",{"text":22,"href":23},"Blog","\u002Fen\u002Fblog\u002F",{"text":25},"Urban Transformation in Turkey Step by Step: How Long Does Each Stage Take? (2026)",[27,40,62,87],{"@type":28,"itemListElement":29},"BreadcrumbList",[30,34,37],{"@type":31,"position":32,"name":19,"item":33},"ListItem",1,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002F",{"@type":31,"position":35,"name":22,"item":36},2,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002F",{"@type":31,"position":38,"name":25,"item":39},3,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F",{"@type":41,"@id":42,"headline":25,"description":43,"datePublished":16,"dateModified":16,"inLanguage":5,"image":44,"author":45,"publisher":51,"mainEntityOfPage":39,"keywords":52,"articleSection":53,"wordCount":54,"mentions":55},"BlogPosting","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F#article","How does urban transformation work in Turkey and how long does it take? Nine steps from the risky building assessment and majority decision to permit, demolition, construction and handover.","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-ates-sitesi-img-03.jpg",{"@type":46,"name":47,"url":48,"parentOrganization":49},"Organization","ÇET Yapı Editorial Team","https:\u002F\u002Fwww.cetyapi.com.tr\u002F",{"@id":50},"https:\u002F\u002Fwww.cetyapi.com.tr\u002F#organization",{"@id":50},"urban transformation process Turkey, kentsel dönüşüm süreci, how long does urban transformation take, Istanbul building renewal steps, Law 6306 process","Urban Transformation",598,[56,58,60],{"@id":57},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F#project",{"@id":59},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fcet-merter-insaya-residences\u002F#project",{"@id":61},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fcet-bahcelievler-insaya-konaklari\u002F#project",{"@type":63,"mainEntity":64},"FAQPage",[65,71,75,79,83],{"@type":66,"name":67,"acceptedAnswer":68},"Question","How long does urban transformation take?",{"@type":69,"text":70},"Answer","It depends on how quickly owners agree, permit times and building size. The statutory periods (notice, objection, demolition) take a few months; construction of a mid-sized apartment block usually takes 18–30 months. Two to three years in total is a realistic expectation.",{"@type":66,"name":72,"acceptedAnswer":73},"How does the process start?",{"@type":69,"text":74},"One or more owners order a risky building assessment from a Ministry-licensed institution. Once final, the owners run the process by simple-majority decisions.",{"@type":66,"name":76,"acceptedAnswer":77},"How many owners must agree?",{"@type":69,"text":78},"Decisions on the parcel of a risky building are taken by a simple majority of owners by land share. Before Law No. 7471 (November 2023) the threshold was two-thirds.",{"@type":66,"name":80,"acceptedAnswer":81},"What if the contractor does not start work?",{"@type":69,"text":82},"If, for reasons attributable to the contractor, construction has not started within one year or has been stalled for at least six months, owners can decide by simple majority to terminate and apply to the Directorate, which gives the contractor 30 days; otherwise the contracts are deemed terminated.",{"@type":66,"name":84,"acceptedAnswer":85},"Is rent assistance paid during construction?",{"@type":69,"text":86},"Owners of risky buildings vacated by agreement may receive monthly rent assistance for 18 months (TRY 8,000 in Istanbul); tenants receive a one-off payment.",{"@type":88,"@id":50,"name":90,"alternateName":91,"legalName":95,"identifier":96,"hasCredential":104,"url":48,"logo":111,"image":113,"description":114,"foundingDate":115,"founder":116,"email":119,"telephone":120,"address":121,"openingHoursSpecification":127,"areaServed":137,"knowsAbout":158,"sameAs":166},[46,89],"GeneralContractor","ÇET Yapı Turizm A.Ş.",[92,93,94],"ÇET Yapı","Çet Yapı","CET Yapi","ÇET YAPI TURİZM ANONİM ŞİRKETİ",[97,101],{"@type":98,"propertyID":99,"value":100},"PropertyValue","MERSİS","0242051074500011",{"@type":98,"propertyID":102,"value":103},"İstanbul Ticaret Sicil No","818550-0",{"@type":105,"credentialCategory":106,"name":107,"recognizedBy":108},"EducationalOccupationalCredential","license","Yapı Müteahhitliği Yetki Belgesi – E grubu (No 0034211566204056)",{"@type":109,"name":110},"GovernmentOrganization","T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı",{"@type":112,"url":113},"ImageObject","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Ftheme\u002Fcet-yapi-logo.png","Founded in Istanbul in 1993, ÇET Yapı is a Turkish contractor delivering turnkey school campuses, housing, urban transformation, design and restoration.","1993",{"@type":117,"name":118},"Person","Doç. Dr. Ahmet Çetinsaya","info@cetyapi.com.tr","+902126623000",{"@type":122,"streetAddress":123,"addressLocality":124,"addressRegion":125,"addressCountry":126},"PostalAddress","Çobançeşme Mah. Sanayi Cad. No:44 Nish İstanbul Residence D Blok D:186 Yenibosna","Bahçelievler","İstanbul","TR",{"@type":128,"dayOfWeek":129,"opens":135,"closes":136},"OpeningHoursSpecification",[130,131,132,133,134],"Monday","Tuesday","Wednesday","Thursday","Friday","09:00","18:00",[138,141,143,146,148,150,152,154,156],{"@type":139,"name":140},"Country","Türkiye",{"@type":142,"name":125},"City",{"@type":144,"name":145},"AdministrativeArea","Beşiktaş, İstanbul",{"@type":144,"name":147},"Kadıköy, İstanbul",{"@type":144,"name":149},"Sarıyer, İstanbul",{"@type":144,"name":151},"Bakırköy, İstanbul",{"@type":144,"name":153},"Üsküdar, İstanbul",{"@type":144,"name":155},"Şişli, İstanbul",{"@type":144,"name":157},"Bahçelievler ve Güngören, İstanbul",[159,160,161,162,163,164,165],"School construction","Educational campus construction","Urban transformation","Real estate development","Architectural design","Historic building restoration","Turnkey construction",[167,168],"https:\u002F\u002Fwww.instagram.com\u002Fcet_yapi\u002F","https:\u002F\u002Fx.com\u002FCetYapi",{"title":25,"html":170,"toc":171,"tldr":202,"faq":207,"sources":213,"image":14,"imageAlt":223,"published":224,"publishedIso":16,"modified":225,"modifiedIso":16,"reading":226,"related":227,"more":237,"urbanCta":250},"\u003Cp>&quot;How is urban transformation done and how long does it take?&quot; is one of the most searched questions about \u003Cem>kentsel dönüşüm\u003C\u002Fem>. The answer depends on how fast owners agree, the municipality&#39;s permit times and the size of the building, but every project follows the same \u003Cstrong>nine steps\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Ch2 id=\"overview\">Overview\u003C\u002Fh2>\n\u003Cdiv class=\"table-responsive\">\u003Ctable class=\"table table-striped table-hover\">\n\u003Cthead>\n\u003Ctr>\n\u003Cth>#\u003C\u002Fth>\n\u003Cth>Step\u003C\u002Fth>\n\u003Cth>Legal \u002F typical duration\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>1\u003C\u002Ftd>\n\u003Ctd>Risky building assessment\u003C\u002Ftd>\n\u003Ctd>A few weeks, depending on the institution\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>2\u003C\u002Ftd>\n\u003Ctd>Title deed annotation and notice\u003C\u002Ftd>\n\u003Ctd>Max. 10 working days + 15-day public notice\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>3\u003C\u002Ftd>\n\u003Ctd>Objection period\u003C\u002Ftd>\n\u003Ctd>15 days after the notice ends\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>4\u003C\u002Ftd>\n\u003Ctd>Owners&#39; meeting and simple-majority decision\u003C\u002Ftd>\n\u003Ctd>Depends on the owners\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>5\u003C\u002Ftd>\n\u003Ctd>Contractor, contract and guarantee\u003C\u002Ftd>\n\u003Ctd>A few weeks to a few months\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>6\u003C\u002Ftd>\n\u003Ctd>Eviction and demolition\u003C\u002Ftd>\n\u003Ctd>Period set by the authority, max. 90 days\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>7\u003C\u002Ftd>\n\u003Ctd>Design and building permit\u003C\u002Ftd>\n\u003Ctd>Varies by municipality\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>8\u003C\u002Ftd>\n\u003Ctd>Construction\u003C\u002Ftd>\n\u003Ctd>Usually 18–30 months for a mid-sized block\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>9\u003C\u002Ftd>\n\u003Ctd>Occupancy permit, condominium and handover\u003C\u002Ftd>\n\u003Ctd>A few weeks after application\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003C\u002Fdiv>\u003Ch2 id=\"1-3-assessment-notice-and-objection\">1–3. Assessment, notice and objection\u003C\u002Fh2>\n\u003Cp>One or more owners order a \u003Cstrong>risky building assessment\u003C\u002Fstrong> from a Ministry-licensed institution. If complete, it is recorded on the title deed \u003Cstrong>within 10 working days\u003C\u002Fstrong>, posted on the building, sent via e-Government and displayed for \u003Cstrong>15 days\u003C\u002Fstrong>; objections can be filed within the following \u003Cstrong>15 days\u003C\u002Fstrong>. See our \u003Ca href=\"\u002Fen\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F\">risky building assessment guide\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"4-simple-majority-decision\">4. Simple-majority decision\u003C\u002Fh2>\n\u003Cp>Decisions on the parcel are taken by a \u003Cstrong>simple majority of land shares\u003C\u002Fstrong> (two-thirds until 2023). For owners who do not join, the law provides an auction procedure — see our article on the \u003Ca href=\"\u002Fen\u002Fblog\u002Fmajority-decision-in-urban-transformation-turkey\u002F\">majority decision\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"5-contractor-contract-and-guarantee\">5. Contractor, contract and guarantee\u003C\u002Fh2>\n\u003Cp>The contractor and sharing ratio are set by the decision, usually in a notarised \u003Ca href=\"\u002Fen\u002Fblog\u002Fflat-for-land-construction-agreements-in-turkey\u002F\">flat-for-land agreement\u003C\u002Fa>. Under Law No. 6306 the contractor must provide \u003Ca href=\"\u002Fen\u002Fblog\u002Fbuilding-completion-insurance-in-turkey\u002F\">building completion insurance\u003C\u002Fa> or a guarantee before the permit. Use our \u003Ca href=\"\u002Fen\u002Fblog\u002Fhow-to-choose-a-contractor-for-urban-transformation-in-turkey\u002F\">contractor checklist\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"6-eviction-and-demolition\">6. Eviction and demolition\u003C\u002Fh2>\n\u003Cp>The authority asks owners to vacate and demolish within \u003Cstrong>up to 90 days\u003C\u002Fstrong>. Owners who vacate by agreement may receive 18 months of \u003Ca href=\"\u002Fen\u002Fblog\u002Furban-transformation-rent-assistance-in-turkey-2026\u002F\">rent assistance\u003C\u002Fa>; tenants get a one-off payment.\u003C\u002Fp>\n\u003Ch2 id=\"7-design-and-permit\">7. Design and permit\u003C\u002Fh2>\n\u003Cp>Architectural, structural and MEP designs are prepared and a \u003Cstrong>building permit\u003C\u002Fstrong> obtained. For \u003Ca href=\"\u002Fen\u002Fblog\u002Fyarisi-bizden-half-from-us-campaign-istanbul\u002F\">Yarısı Bizden\u003C\u002Fa> support in Istanbul, the new area (excluding parking and shelter) must not exceed \u003Cstrong>1.5 times\u003C\u002Fstrong> the existing building. Municipal fees are waived up to 1.5 times the existing area (\u003Ca href=\"\u002Fen\u002Fblog\u002Ftax-and-fee-exemptions-in-urban-transformation-turkey\u002F\">tax and fee exemptions\u003C\u002Fa>).\u003C\u002Fp>\n\u003Ch2 id=\"8-construction\">8. Construction\u003C\u002Fh2>\n\u003Cp>Duration depends on storeys, ground conditions and basements; \u003Cstrong>18–30 months\u003C\u002Fstrong> is realistic for a mid-sized block. ÇET Yapı&#39;s \u003Cstrong>Ateş residences\u003C\u002Fstrong> in Yeşilköy, with 2,340 m² of construction area, were completed in \u003Cstrong>20 months\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Cp>If the contractor fails to \u003Cstrong>start within one year\u003C\u002Fstrong> or work has been \u003Cstrong>stalled for six months\u003C\u002Fstrong>, owners can decide by simple majority to terminate and apply to the Directorate; after a \u003Cstrong>30-day\u003C\u002Fstrong> warning the contracts are deemed terminated.\u003C\u002Fp>\n\u003Ch2 id=\"9-occupancy-permit-and-handover\">9. Occupancy permit and handover\u003C\u002Fh2>\n\u003Cp>After completion, the \u003Cstrong>occupancy permit\u003C\u002Fstrong> is obtained, condominium ownership established and units registered to owners per the agreement — without land registry or notary fees under Law No. 6306.\u003C\u002Fp>\n\u003Ch2 id=\"five-tips-to-speed-things-up\">Five tips to speed things up\u003C\u002Fh2>\n\u003Col>\n\u003Cli>Collect all owners&#39; contact details and powers of attorney early.\u003C\u002Fli>\n\u003Cli>Choose the assessment institution and contractor on references.\u003C\u002Fli>\n\u003Cli>Prepare the feasibility study before the decision meeting.\u003C\u002Fli>\n\u003Cli>Write delivery time, delay penalties and staged title transfer into the contract.\u003C\u002Fli>\n\u003Cli>Apply for rent and relocation support within one year of eviction.\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Ch2 id=\"urban-transformation-with-cet-yapi\">Urban transformation with ÇET Yapı\u003C\u002Fh2>\n\u003Cp>ÇET Yapı has delivered residential, school and urban transformation projects in Istanbul since 1993. For a preliminary assessment and timeline for your building, fill in our \u003Ca href=\"\u002Fen\u002Furban-transformation\u002F#on-basvuru\">pre-application form\u003C\u002Fa>.\u003C\u002Fp>\n\u003Cp>\u003Cem>This article is general information; durations vary by project and authority.\u003C\u002Fem>\u003C\u002Fp>\n",[172,175,178,181,184,187,190,193,196,199],{"id":173,"text":174},"overview","Overview",{"id":176,"text":177},"1-3-assessment-notice-and-objection","1–3. Assessment, notice and objection",{"id":179,"text":180},"4-simple-majority-decision","4. Simple-majority decision",{"id":182,"text":183},"5-contractor-contract-and-guarantee","5. Contractor, contract and guarantee",{"id":185,"text":186},"6-eviction-and-demolition","6. Eviction and demolition",{"id":188,"text":189},"7-design-and-permit","7. Design and permit",{"id":191,"text":192},"8-construction","8. Construction",{"id":194,"text":195},"9-occupancy-permit-and-handover","9. Occupancy permit and handover",{"id":197,"text":198},"five-tips-to-speed-things-up","Five tips to speed things up",{"id":200,"text":201},"urban-transformation-with-cet-yapi","Urban transformation with ÇET Yapı",[203,204,205,206],"The process starts with a risky building assessment, which is recorded on the title deed and displayed for 15 days, followed by a 15-day objection period.","After it becomes final, owners decide by a simple majority of land shares; the contractor and design are chosen by this decision.","The authority gives up to 90 days for eviction and demolition, followed by permit, construction, occupancy permit and registration of the new units.","Construction of a mid-sized apartment block typically takes 18–30 months; ÇET Yapı's Yeşilköy Ateş residences (2,340 m²) were completed in 20 months.",[208,209,210,211,212],{"q":67,"a":70},{"q":72,"a":74},{"q":76,"a":78},{"q":80,"a":82},{"q":84,"a":86},[214,217,220],{"title":215,"url":216},"Law No. 6306 (Article 6: decisions, termination and implementation)","https:\u002F\u002Fwww.mevzuat.gov.tr\u002Fmevzuat?MevzuatNo=6306&MevzuatTur=1&MevzuatTertip=5",{"title":218,"url":219},"Implementing Regulation of Law No. 6306 (Articles 7, 8, 15 and 16)","https:\u002F\u002Fwww.mevzuat.gov.tr\u002Fmevzuat?MevzuatNo=16849&MevzuatTur=7&MevzuatTertip=5",{"title":221,"url":222},"Marmara Urban Transformation Directorate – Risky building process","https:\u002F\u002Fistanbulakdm.csb.gov.tr\u002Friskli-yapi-sureci-i-104407","Yeşilköy Ateş residences by ÇET Yapı, completed in 20 months through urban transformation","1 October 2026",null,"3 min read",[228,231,234],{"href":229,"title":230},"\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F","Yeşilköy Ateş Residence",{"href":232,"title":233},"\u002Fen\u002Fprojects\u002Fcet-merter-insaya-residences\u002F","Çet Merter İnsaya Residences",{"href":235,"title":236},"\u002Fen\u002Fprojects\u002Fcet-bahcelievler-insaya-konaklari\u002F","Çet Bahçelievler İnsaya Residences",[238,241,244,247],{"href":239,"title":240},"\u002Fen\u002Fblog\u002Furban-transformation-in-bakirkoy-yesilkoy-florya-atakoy\u002F","Urban Transformation in Bakırköy: Yeşilköy, Florya, Ataköy and Kartaltepe (2026 Guide)",{"href":242,"title":243},"\u002Fen\u002Fblog\u002Fwill-my-flat-shrink-in-urban-transformation-turkey\u002F","Will My Flat Get Smaller in Urban Transformation? Land Share, Floor Area Ratio and m² (2026)",{"href":245,"title":246},"\u002Fen\u002Fblog\u002Finherited-shared-and-mortgaged-flats-in-urban-transformation-turkey\u002F","Inherited, Co-Owned and Mortgaged Flats in Urban Transformation: How Does It Work? (2026)",{"href":248,"title":249},"\u002Fen\u002Fblog\u002Furban-transformation-in-besiktas-etiler-levent-ulus\u002F","Urban Transformation in Beşiktaş: Etiler, Levent, Ulus and the Bosphorus Area (2026 Guide)","\u002Fen\u002Furban-transformation\u002F#on-basvuru",{"\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-ates-sitesi-img-03.jpg":252},[253,254],800,533,{"home":20,"corporate":256,"projectTypes":275,"allProjects":288,"news":289,"blog":23,"contact":290,"urban":293,"legal":295,"legalPages":311,"languages":312},[257,260,263,266,269,272],{"href":258,"title":259},"\u002Fen\u002Fabout-us\u002F","About Us",{"href":261,"title":262},"\u002Fen\u002Fchairmans-message\u002F","Chairman's Message",{"href":264,"title":265},"\u002Fen\u002Four-mission-and-vision\u002F","Our Mission and Vision",{"href":267,"title":268},"\u002Fen\u002Fhistory\u002F","History",{"href":270,"title":271},"\u002Fen\u002Fquality-policy\u002F","Our Quality Policy",{"href":273,"title":274},"\u002Fen\u002Fhuman-resources\u002F","Human Resources",[276,279,282,285],{"href":277,"title":278},"\u002Fen\u002Fproject-type\u002Fcontracting-services\u002F","Contracting Services",{"href":280,"title":281},"\u002Fen\u002Fproject-type\u002Freal-estate-development\u002F","Real Estate Development",{"href":283,"title":284},"\u002Fen\u002Fproject-type\u002Farchitectural-project\u002F","Architectural Project",{"href":286,"title":287},"\u002Fen\u002Fproject-type\u002Frenovation-restoration\u002F","Renovation Restoration","\u002Fen\u002Fprojects\u002F","\u002Fen\u002Fcategory\u002Fnews\u002F",{"href":291,"title":292},"\u002Fen\u002Fcontact-us\u002F","Contact Us",{"href":294,"title":53},"\u002Fen\u002Furban-transformation\u002F",[296,299,302,305,308],{"href":297,"title":298},"\u002Fen\u002Fcookie-policy\u002F","Cookie Policy",{"href":300,"title":301},"\u002Fen\u002Furban-transformation-pre-application-privacy-notice\u002F","Urban Transformation Pre-Application Form Privacy Notice",{"href":303,"title":304},"\u002Fen\u002Fcommercial-electronic-message-consent\u002F","Commercial Electronic Message Consent",{"href":306,"title":307},"\u002Fen\u002Fpersonal-data-retention-and-destruction-policy\u002F","Personal Data Retention and Destruction Policy",{"href":309,"title":310},"\u002Fen\u002Fprivacy-and-security-policy\u002F","Privacy and Security Policy",{"cerez-politikasi":297,"kentsel-donusum-aydinlatma-metni":300,"ticari-elektronik-ileti-onayi":303,"kisisel-veri-saklama-ve-imha-politikasi":306,"gizlilik-ve-guvenlik-politikasi":309},[313,316,318,322],{"code":314,"label":126,"home":315},"tr","\u002F",{"code":5,"label":317,"home":20},"EN",{"code":319,"label":320,"home":321},"ar","AR","\u002Far\u002F",{"code":323,"label":324,"home":325},"ru","RU","\u002Fru\u002F",1793451806950]