[{"data":1,"prerenderedAt":340},["ShallowReactive",2],{"page:\u002Fen\u002Fblog\u002Fturkey-zoning-regulation-amendment-2026\u002F":3,"nav:en":264},{"kind":4,"locale":5,"path":6,"alternates":7,"seo":11,"breadcrumbs":17,"jsonld":26,"data":186,"dims":260},"blog","en","\u002Fen\u002Fblog\u002Fturkey-zoning-regulation-amendment-2026\u002F",{"tr":8,"en":6,"ar":9,"ru":10},"\u002Fblog\u002Fplanli-alanlar-imar-yonetmeligi-degisikligi-2026\u002F","\u002Far\u002Fblog\u002Fturkey-zoning-regulation-amendment-2026\u002F","\u002Fru\u002Fblog\u002Fizmeneniya-pravil-zastroyki-turtsii-2026\u002F",{"title":12,"description":13,"image":14,"canonical":6,"type":15,"published":16,"modified":16},"Turkey Zoning Regulation Amendment 2026 | ÇET Yapı","Turkey's Planned Areas Zoning Regulation changed on 1 July 2026: 40% site coverage in detached layouts, lift shaft in 3-storey buildings, permit renewal.","\u002Fimages\u002Fuploads\u002F2026\u002F11\u002Finsaya-14-atakoy-kus-bakisi.jpg","article","2026-11-08",[18,21,24],{"text":19,"href":20},"Home","\u002Fen\u002F",{"text":22,"href":23},"Blog","\u002Fen\u002Fblog\u002F",{"text":25},"Turkey's July 2026 Zoning Regulation Amendment: 40% Footprint, Lifts, Permits and Office-to-Residential Conversion",[27,40,62,91],{"@type":28,"itemListElement":29},"BreadcrumbList",[30,34,37],{"@type":31,"position":32,"name":19,"item":33},"ListItem",1,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002F",{"@type":31,"position":35,"name":22,"item":36},2,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002F",{"@type":31,"position":38,"name":25,"item":39},3,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Fturkey-zoning-regulation-amendment-2026\u002F",{"@type":41,"@id":42,"headline":25,"description":43,"datePublished":16,"dateModified":16,"inLanguage":5,"image":44,"author":45,"publisher":51,"mainEntityOfPage":39,"keywords":52,"articleSection":53,"wordCount":54,"mentions":55},"BlogPosting","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Fturkey-zoning-regulation-amendment-2026\u002F#article","Turkey's Planned Areas Zoning Regulation changed on 1 July 2026: 40% site coverage in detached layouts, lift shaft in 3-storey buildings, permit renewal, renovation of older buildings and office-to-residential conversion up to 60%.","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Fuploads\u002F2026\u002F11\u002Finsaya-14-atakoy-kus-bakisi.jpg",{"@type":46,"name":47,"url":48,"parentOrganization":49},"Organization","ÇET Yapı Editorial Team","https:\u002F\u002Fwww.cetyapi.com.tr\u002F",{"@id":50},"https:\u002F\u002Fwww.cetyapi.com.tr\u002F#organization",{"@id":50},"Turkey zoning regulation 2026, Planlı Alanlar İmar Yönetmeliği, TAKS 40 percent, lift requirement Turkey, office to residential conversion Turkey, building permit renewal Turkey","Legal & Guarantees",793,[56,58,60],{"@id":57},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fcet-merter-insaya-residences\u002F#project",{"@id":59},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fcet-bahcelievler-insaya-konaklari\u002F#project",{"@id":61},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F#project",{"@type":63,"mainEntity":64},"FAQPage",[65,71,75,79,83,87],{"@type":66,"name":67,"acceptedAnswer":68},"Question","When did the zoning regulation amendment take effect?",{"@type":69,"text":70},"Answer","It was published in Official Gazette No. 33297 on 1 July 2026 and took effect on publication.",{"@type":66,"name":72,"acceptedAnswer":73},"Does the 40% TAKS rule apply to every plot?",{"@type":69,"text":74},"No. It applies in detached or block layouts where the implementation plan does not set a TAKS value. Where the plan sets one, the plan value applies.",{"@type":66,"name":76,"acceptedAnswer":77},"Is a lift mandatory in a three-storey building?",{"@type":69,"text":78},"A three-storey building must reserve space for a lift; buildings of four or more storeys must install one. Basements containing units, common areas or annexes count as storeys. Single-unit houses are exempt.",{"@type":66,"name":80,"acceptedAnswer":81},"Are urban transformation projects affected by the new lift rules?",{"@type":69,"text":82},"The new lift rules do not apply to buildings whose permit application was made before 1 July 2026, buildings with a notarised construction contract under Law 6306, or buildings with a tender decision. The earlier rules apply to them. There is no such exemption for the other changes.",{"@type":66,"name":84,"acceptedAnswer":85},"What happens to a permitted building whose construction has not started?",{"@type":69,"text":86},"If construction has not started within two years of the permit date, a new permit is issued under the current plan and rules. If it started within two years, current rules apply to fire, earthquake, heat and water insulation, environment and energy efficiency, and the permit-date rules apply to everything else.",{"@type":66,"name":88,"acceptedAnswer":89},"Can an office be converted into housing?",{"@type":69,"text":90},"In areas where the implementation plan allowed housing before the amendment, buildings with an office permit whose construction has started, or with an occupancy permit, may obtain an alteration permit for residential use provided housing does not exceed 60% of the whole parcel. This must be concluded within one year of publication.",{"@type":92,"@id":50,"name":94,"alternateName":95,"legalName":99,"identifier":100,"hasCredential":108,"url":48,"logo":115,"image":117,"description":118,"foundingDate":119,"founder":120,"email":123,"telephone":124,"address":125,"geo":132,"hasMap":136,"contactPoint":137,"openingHoursSpecification":142,"areaServed":152,"knowsAbout":175,"sameAs":183},[46,93],"GeneralContractor","ÇET Yapı Turizm A.Ş.",[96,97,98],"ÇET Yapı","Çet Yapı","CET Yapi","ÇET YAPI TURİZM ANONİM ŞİRKETİ",[101,105],{"@type":102,"propertyID":103,"value":104},"PropertyValue","MERSİS","0242051074500011",{"@type":102,"propertyID":106,"value":107},"İstanbul Ticaret Sicil No","818550-0",{"@type":109,"credentialCategory":110,"name":111,"recognizedBy":112},"EducationalOccupationalCredential","license","Yapı Müteahhitliği Yetki Belgesi – E grubu (No 0034211566204056)",{"@type":113,"name":114},"GovernmentOrganization","T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı",{"@type":116,"url":117},"ImageObject","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Ftheme\u002Fcet-yapi-logo.png","Founded in Istanbul in 1993, ÇET Yapı is a Turkish contractor delivering turnkey school campuses, housing, urban transformation, design and restoration.","1993",{"@type":121,"name":122},"Person","Doç. Dr. Ahmet Çetinsaya","info@cetyapi.com.tr","+902126623000",{"@type":126,"streetAddress":127,"addressLocality":128,"addressRegion":129,"postalCode":130,"addressCountry":131},"PostalAddress","Çobançeşme Mah. Sanayi Cad. No:44 Nish İstanbul Residence D Blok D:186 Yenibosna","Bahçelievler","İstanbul","34197","TR",{"@type":133,"latitude":134,"longitude":135},"GeoCoordinates",40.99583,28.82442,"https:\u002F\u002Fwww.google.com\u002Fmaps\u002Fsearch\u002F?api=1&query=40.99583,28.82442",{"@type":138,"contactType":139,"telephone":124,"email":123,"areaServed":131,"availableLanguage":140},"ContactPoint","customer service",[141],"Turkish",{"@type":143,"dayOfWeek":144,"opens":150,"closes":151},"OpeningHoursSpecification",[145,146,147,148,149],"Monday","Tuesday","Wednesday","Thursday","Friday","09:00","18:00",[153,156,158,161,163,165,167,169,171,173],{"@type":154,"name":155},"Country","Türkiye",{"@type":157,"name":129},"City",{"@type":159,"name":160},"AdministrativeArea","Beşiktaş, İstanbul",{"@type":159,"name":162},"Kadıköy, İstanbul",{"@type":159,"name":164},"Sarıyer, İstanbul",{"@type":159,"name":166},"Bakırköy, İstanbul",{"@type":159,"name":168},"Üsküdar, İstanbul",{"@type":159,"name":170},"Şişli, İstanbul",{"@type":159,"name":172},"Bahçelievler, İstanbul",{"@type":159,"name":174},"Güngören, İstanbul",[176,177,178,179,180,181,182],"School construction","Educational campus construction","Urban transformation","Real estate development","Architectural design","Historic building restoration","Turnkey construction",[184,185],"https:\u002F\u002Fwww.instagram.com\u002Fcet_yapi\u002F","https:\u002F\u002Fx.com\u002FCetYapi",{"title":25,"html":187,"toc":188,"tldr":213,"faq":219,"sources":226,"image":14,"imageAlt":233,"published":234,"publishedIso":16,"modified":235,"modifiedIso":16,"reading":236,"related":237,"more":247,"urbanCta":235},"\u003Cp>Turkey&#39;s \u003Cstrong>Planned Areas Zoning Regulation\u003C\u002Fstrong> (Planlı Alanlar İmar Yönetmeliği) sets the core rules municipalities apply when issuing building permits: how much of the plot a building may cover, how many square metres can be built, and lift and common-area requirements. An amendment was published in Official Gazette No. 33297 on \u003Cstrong>1 July 2026\u003C\u002Fstrong> and \u003Cstrong>took effect the same day\u003C\u002Fstrong>. Below are the changes, based on the official text, from a landowner&#39;s point of view.\u003C\u002Fp>\n\u003Ch2 id=\"1-site-coverage-capped-at-40-in-detached-and-block-layouts\">1. Site coverage capped at 40% in detached and block layouts\u003C\u002Fh2>\n\u003Cp>\u003Cstrong>Site coverage (TAKS)\u003C\u002Fstrong> is the ratio of the building footprint to the plot area. Under the new rule, in detached or block layouts, \u003Cstrong>TAKS may not exceed 40% unless the implementation plan explicitly sets it.\u003C\u002Fstrong>\u003C\u002Fp>\n\u003Cp>Where the plan gives no floor-area ratio (KAKS), the building follows setback distances; in that case, and where setbacks and KAKS are given but TAKS is not, TAKS may not exceed \u003Cstrong>60%\u003C\u002Fstrong>. In practice, footprints on small plots may shrink — which affects floor plans and the question of \u003Ca href=\"\u002Fen\u002Fblog\u002Fwill-my-flat-shrink-in-urban-transformation-turkey\u002F\">whether your flat will shrink in urban transformation\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"2-lifts-space-at-three-storeys-a-lift-at-four\">2. Lifts: space at three storeys, a lift at four\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Cstrong>Three-storey\u003C\u002Fstrong> buildings must \u003Cstrong>reserve space for a lift\u003C\u002Fstrong>; buildings of \u003Cstrong>four or more\u003C\u002Fstrong> storeys must \u003Cstrong>install a lift\u003C\u002Fstrong>.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Basements containing units, common areas or annexes\u003C\u002Fstrong> count as storeys. Technical spaces such as boiler rooms, electrical rooms, water tanks and generator rooms do not.\u003C\u002Fli>\n\u003Cli>Where a lift is mandatory, it must serve all floors including basements, except basements without units, common areas or annexes.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Single-unit houses\u003C\u002Fstrong> are exempt. Legally built detached houses of up to three storeys (excluding the basement) may add a \u003Cstrong>lift or accessibility platform\u003C\u002Fstrong> later with the authority&#39;s permit.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2 id=\"3-gardens-ornamental-pools-and-floor-area\">3. Gardens, ornamental pools and floor area\u003C\u002Fh2>\n\u003Cp>A definition of \u003Cstrong>ornamental pool\u003C\u002Fstrong> was added: integrated with the architecture, for visual and aesthetic purposes and \u003Cstrong>not used for swimming\u003C\u002Fstrong>. The list of areas excluded from the floor-area calculation now includes garden \u003Cstrong>pergolas and ornamental pools\u003C\u002Fstrong> that are not units and not part of the main structure, up to \u003Cstrong>20% of the garden area\u003C\u002Fstrong> together with related uses, as well as entrance canopies and garden and retaining walls.\u003C\u002Fp>\n\u003Cp>In public-use buildings, even with a single unit, \u003Cstrong>children&#39;s play areas, prayer rooms, parking\u003C\u002Fstrong> and an unused roof terrace on the top floor count as common areas.\u003C\u002Fp>\n\u003Ch2 id=\"4-permits-the-two-year-rule\">4. Permits: the two-year rule\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>If construction \u003Cstrong>starts within two years\u003C\u002Fstrong> of the permit date, current rules apply to \u003Cstrong>fire, earthquake, heat and water insulation, environment and energy efficiency\u003C\u002Fstrong>, and the permit-date rules to everything else.\u003C\u002Fli>\n\u003Cli>If construction \u003Cstrong>does not start within two years\u003C\u002Fstrong>, a \u003Cstrong>new permit is issued under the current plan and rules\u003C\u002Fstrong>.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>This matters for permitted projects on hold: if the deadline passes, the design may have to be redrawn under the new coverage and lift rules.\u003C\u002Fp>\n\u003Ch2 id=\"5-major-alterations-to-older-buildings-with-occupancy-permits\">5. Major alterations to older buildings with occupancy permits\u003C\u002Fh2>\n\u003Cp>For buildings that obtained an occupancy permit before the amendment, \u003Cstrong>major alterations\u003C\u002Fstrong> may be concluded \u003Cstrong>under the regulation in force on the original permit date\u003C\u002Fstrong>, provided that floor area, use, unit land shares, eave level and setbacks are unchanged, the structure is not adversely affected, and fire, earthquake, insulation, environmental and energy measures are taken. This matters for buildings choosing \u003Ca href=\"\u002Fen\u002Fblog\u002Fseismic-retrofit-or-rebuild-turkey\u002F\">retrofit over rebuild\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"6-office-to-residential-conversion-60-and-one-year\">6. Office-to-residential conversion: 60% and one year\u003C\u002Fh2>\n\u003Cp>Under provisional Article 7:\u003C\u002Fp>\n\u003Cul>\n\u003Cli>in areas where the \u003Cstrong>implementation plan allowed housing\u003C\u002Fstrong> before the amendment,\u003C\u002Fli>\n\u003Cli>for buildings with an \u003Cstrong>office permit whose construction has started, or with an occupancy permit\u003C\u002Fstrong>,\u003C\u002Fli>\n\u003Cli>an \u003Cstrong>alteration permit\u003C\u002Fstrong> for residential use may be issued provided \u003Cstrong>housing does not exceed 60% of the whole parcel\u003C\u002Fstrong>,\u003C\u002Fli>\n\u003Cli>and this must be concluded \u003Cstrong>within one year\u003C\u002Fstrong> of publication — that is, by \u003Cstrong>1 July 2027\u003C\u002Fstrong>.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2 id=\"what-it-means-for-urban-transformation-projects\">What it means for urban transformation projects\u003C\u002Fh2>\n\u003Cp>The regulation states that \u003Cstrong>only the new lift rules\u003C\u002Fstrong> do not apply — and the earlier rules continue — for:\u003C\u002Fp>\n\u003Cul>\n\u003Cli>buildings whose permit application was made before the amendment took effect,\u003C\u002Fli>\n\u003Cli>buildings with a \u003Cstrong>notarised construction contract under Law 6306\u003C\u002Fstrong>,\u003C\u002Fli>\n\u003Cli>buildings with a tender decision or tender date.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>There is no such exemption for site coverage, the permit deadline or common areas. Projects signing contracts after 1 July 2026 should therefore be designed under the new rules from the outset. See our \u003Ca href=\"\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F\">step-by-step urban transformation process\u003C\u002Fa> and our guide to \u003Ca href=\"\u002Fen\u002Fblog\u002Fflat-for-land-construction-agreements-in-turkey\u002F\">flat-for-land agreements\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"assess-your-project-with-cet-yapi\">Assess your project with ÇET Yapı\u003C\u002Fh2>\n\u003Cp>ÇET Yapı treats the zoning status and floor-area calculation as the first step of feasibility in its residential, school and urban transformation projects in Istanbul. To calculate what your plot allows under the new coverage and lift rules, fill in the \u003Ca href=\"\u002Fen\u002Furban-transformation\u002F#on-basvuru\">pre-application form\u003C\u002Fa>.\u003C\u002Fp>\n\u003Cp>\u003Cem>This article is for general information. The rules for your plot are confirmed by its zoning status certificate and the municipality&#39;s practice.\u003C\u002Fem>\u003C\u002Fp>\n",[189,192,195,198,201,204,207,210],{"id":190,"text":191},"1-site-coverage-capped-at-40-in-detached-and-block-layouts","1. Site coverage capped at 40% in detached and block layouts",{"id":193,"text":194},"2-lifts-space-at-three-storeys-a-lift-at-four","2. Lifts: space at three storeys, a lift at four",{"id":196,"text":197},"3-gardens-ornamental-pools-and-floor-area","3. Gardens, ornamental pools and floor area",{"id":199,"text":200},"4-permits-the-two-year-rule","4. Permits: the two-year rule",{"id":202,"text":203},"5-major-alterations-to-older-buildings-with-occupancy-permits","5. Major alterations to older buildings with occupancy permits",{"id":205,"text":206},"6-office-to-residential-conversion-60-and-one-year","6. Office-to-residential conversion: 60% and one year",{"id":208,"text":209},"what-it-means-for-urban-transformation-projects","What it means for urban transformation projects",{"id":211,"text":212},"assess-your-project-with-cet-yapi","Assess your project with ÇET Yapı",[214,215,216,217,218],"The amendment to the Planned Areas Zoning Regulation was published in Official Gazette No. 33297 on 1 July 2026 and took effect the same day.","In detached or block layouts, site coverage (TAKS) may not exceed 40% unless the implementation plan states otherwise.","Three-storey buildings must reserve space for a lift; buildings of four or more storeys must install one. These lift rules do not apply to buildings with a notarised construction contract under Law 6306.","If construction does not start within two years of the permit date, a new permit is issued under current plans and rules.","Office-licensed buildings may be converted to residential use, provided housing does not exceed 60% of the parcel, within one year.",[220,221,222,223,224,225],{"q":67,"a":70},{"q":72,"a":74},{"q":76,"a":78},{"q":80,"a":82},{"q":84,"a":86},{"q":88,"a":90},[227,230],{"title":228,"url":229},"Official Gazette – Regulation amending the Planned Areas Zoning Regulation (1 July 2026, No. 33297)","https:\u002F\u002Fwww.resmigazete.gov.tr\u002Feskiler\u002F2026\u002F07\u002F20260701-7.htm",{"title":231,"url":232},"Alomaliye – Planlı Alanlar İmar Yönetmeliğinde Değişiklik (in Turkish)","https:\u002F\u002Fwww.alomaliye.com\u002F2026\u002F07\u002F01\u002Fplanli-alanlar-imar-yonetmeliginde-degisiklik-01-07-2026\u002F","Aerial rendering of the İnsaya 14 Ataköy residential project: building footprint, garden and entrance","8 November 2026",null,"4 min read",[238,241,244],{"href":239,"title":240},"\u002Fen\u002Fprojects\u002Fcet-merter-insaya-residences\u002F","Çet Merter İnsaya Residences",{"href":242,"title":243},"\u002Fen\u002Fprojects\u002Fcet-bahcelievler-insaya-konaklari\u002F","Çet Bahçelievler İnsaya Residences",{"href":245,"title":246},"\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F","Yeşilköy Ateş Residence",[248,251,254,257],{"href":249,"title":250},"\u002Fen\u002Fblog\u002Flaw-7579-turkey-construction-building-inspection-changes\u002F","Turkey's Law No. 7579: What Changed for Contractors, Concrete, Soil Surveys and Fire Safety (2026)",{"href":252,"title":253},"\u002Fen\u002Fblog\u002Furban-transformation-in-bakirkoy-yesilkoy-florya-atakoy\u002F","Urban Transformation in Bakırköy: Yeşilköy, Florya, Ataköy and Kartaltepe (2026 Guide)",{"href":255,"title":256},"\u002Fen\u002Fblog\u002Fwill-my-flat-shrink-in-urban-transformation-turkey\u002F","Will My Flat Get Smaller in Urban Transformation? Land Share, Floor Area Ratio and m² (2026)",{"href":258,"title":259},"\u002Fen\u002Fblog\u002Finherited-shared-and-mortgaged-flats-in-urban-transformation-turkey\u002F","Inherited, Co-Owned and Mortgaged Flats in Urban Transformation: How Does It Work? (2026)",{"\u002Fimages\u002Fuploads\u002F2026\u002F11\u002Finsaya-14-atakoy-kus-bakisi.jpg":261},[262,263],1920,1280,{"home":20,"corporate":265,"services":284,"projectTypes":291,"allProjects":301,"news":302,"blog":23,"contact":303,"urban":306,"legal":309,"legalPages":325,"languages":326},[266,269,272,275,278,281],{"href":267,"title":268},"\u002Fen\u002Fabout-us\u002F","About Us",{"href":270,"title":271},"\u002Fen\u002Fchairmans-message\u002F","Chairman's Message",{"href":273,"title":274},"\u002Fen\u002Four-mission-and-vision\u002F","Our Mission and Vision",{"href":276,"title":277},"\u002Fen\u002Fhistory\u002F","History",{"href":279,"title":280},"\u002Fen\u002Fquality-policy\u002F","Our Quality Policy",{"href":282,"title":283},"\u002Fen\u002Fhuman-resources\u002F","Human Resources",[285,288],{"href":286,"title":287},"\u002Fen\u002Fschool-construction\u002F","School Construction",{"href":289,"title":290},"\u002Fen\u002Frestoration-and-renovation\u002F","Restoration & Renovation",[292,295,298],{"href":293,"title":294},"\u002Fen\u002Fproject-type\u002Fcontracting-services\u002F","Contracting Services",{"href":296,"title":297},"\u002Fen\u002Fproject-type\u002Freal-estate-development\u002F","Real Estate Development",{"href":299,"title":300},"\u002Fen\u002Fproject-type\u002Farchitectural-project\u002F","Architectural Project","\u002Fen\u002Fprojects\u002F","\u002Fen\u002Fcategory\u002Fnews\u002F",{"href":304,"title":305},"\u002Fen\u002Fcontact-us\u002F","Contact Us",{"href":307,"title":308},"\u002Fen\u002Furban-transformation\u002F","Urban Transformation",[310,313,316,319,322],{"href":311,"title":312},"\u002Fen\u002Fcookie-policy\u002F","Cookie Policy",{"href":314,"title":315},"\u002Fen\u002Furban-transformation-pre-application-privacy-notice\u002F","Urban Transformation Pre-Application Form Privacy Notice",{"href":317,"title":318},"\u002Fen\u002Fcommercial-electronic-message-consent\u002F","Commercial Electronic Message Consent",{"href":320,"title":321},"\u002Fen\u002Fpersonal-data-retention-and-destruction-policy\u002F","Personal Data Retention and Destruction Policy",{"href":323,"title":324},"\u002Fen\u002Fprivacy-and-security-policy\u002F","Privacy and Security Policy",{"cerez-politikasi":311,"kentsel-donusum-aydinlatma-metni":314,"ticari-elektronik-ileti-onayi":317,"kisisel-veri-saklama-ve-imha-politikasi":320,"gizlilik-ve-guvenlik-politikasi":323},[327,330,332,336],{"code":328,"label":131,"home":329},"tr","\u002F",{"code":5,"label":331,"home":20},"EN",{"code":333,"label":334,"home":335},"ar","AR","\u002Far\u002F",{"code":337,"label":338,"home":339},"ru","RU","\u002Fru\u002F",1794156895845]