[{"data":1,"prerenderedAt":317},["ShallowReactive",2],{"page:\u002Fen\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F":3,"nav:en":246},{"kind":4,"locale":5,"path":6,"alternates":7,"seo":11,"breadcrumbs":17,"jsonld":26,"data":169,"dims":242},"blog","en","\u002Fen\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F",{"tr":8,"en":6,"ar":9,"ru":10},"\u002Fblog\u002Friskli-yapi-tespiti-nasil-yapilir-itiraz\u002F","\u002Far\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F","\u002Fru\u002Fblog\u002Fotsenka-avariynosti-zdaniya-v-turtsii\u002F",{"title":12,"description":13,"image":14,"canonical":6,"type":15,"published":16,"modified":16},"Risky Building Assessment in Turkey: Process and Objections","Who orders a risky building assessment in Turkey, where to apply and how long it takes. Title deed annotation, 15-day notice and objection period, lawsuits…","\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-akuren-apartmani-img-02.jpg","article","2026-10-01",[18,21,24],{"text":19,"href":20},"Home","\u002Fen\u002F",{"text":22,"href":23},"Blog","\u002Fen\u002Fblog\u002F",{"text":25},"Risky Building Assessment in Turkey: Application, Deadlines, Objections and the Title Deed Note (2026)",[27,40,62,87],{"@type":28,"itemListElement":29},"BreadcrumbList",[30,34,37],{"@type":31,"position":32,"name":19,"item":33},"ListItem",1,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002F",{"@type":31,"position":35,"name":22,"item":36},2,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002F",{"@type":31,"position":38,"name":25,"item":39},3,"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F",{"@type":41,"@id":42,"headline":25,"description":43,"datePublished":16,"dateModified":16,"inLanguage":5,"image":44,"author":45,"publisher":51,"mainEntityOfPage":39,"keywords":52,"articleSection":53,"wordCount":54,"mentions":55},"BlogPosting","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fblog\u002Frisky-building-assessment-in-turkey\u002F#article","Who orders a risky building assessment in Turkey, where to apply and how long it takes. Title deed annotation, 15-day notice and objection period, lawsuits and demolition.","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-akuren-apartmani-img-02.jpg",{"@type":46,"name":47,"url":48,"parentOrganization":49},"Organization","ÇET Yapı Editorial Team","https:\u002F\u002Fwww.cetyapi.com.tr\u002F",{"@id":50},"https:\u002F\u002Fwww.cetyapi.com.tr\u002F#organization",{"@id":50},"risky building assessment Turkey, riskli yapı tespiti, earthquake risk report Istanbul building, objection risky building, Law 6306 risky building","Urban Transformation",491,[56,58,60],{"@id":57},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F#project",{"@id":59},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fyesilkoy-akuren-apartment\u002F#project",{"@id":61},"https:\u002F\u002Fwww.cetyapi.com.tr\u002Fen\u002Fprojects\u002Fbesiktas-geo-college\u002F#project",{"@type":63,"mainEntity":64},"FAQPage",[65,71,75,79,83],{"@type":66,"name":67,"acceptedAnswer":68},"Question","Who can order a risky building assessment?",{"@type":69,"text":70},"Answer","Primarily the owners or their legal representatives, at their own cost. The Directorate or municipality may also carry it out ex officio or require owners to do it within a set period.",{"@type":66,"name":72,"acceptedAnswer":73},"Where do I apply?",{"@type":69,"text":74},"To an institution licensed by the Ministry of Environment, Urbanisation and Climate Change. The request is recorded in the Ministry's electronic system; if no assessment is made within two months, the record can be deleted at any owner's request.",{"@type":66,"name":76,"acceptedAnswer":77},"How long does it take?",{"@type":69,"text":78},"Fieldwork and lab time vary by institution. After review, a building found risky is reported to the land registry within 10 working days at the latest and then publicly displayed for 15 days.",{"@type":66,"name":80,"acceptedAnswer":81},"How can I object?",{"@type":69,"text":82},"Owners or their legal representatives submit a petition to the Provincial Directorate within 15 days after the last day of the neighbourhood notice. A technical board reviews the objection.",{"@type":66,"name":84,"acceptedAnswer":85},"What if someone blocks the assessment?",{"@type":69,"text":86},"If access is refused, the assessment can be carried out ex officio with police assistance, with the written permission of the district governor.",{"@type":88,"@id":50,"name":90,"alternateName":91,"legalName":95,"identifier":96,"hasCredential":104,"url":48,"logo":111,"image":113,"description":114,"foundingDate":115,"founder":116,"email":119,"telephone":120,"address":121,"openingHoursSpecification":127,"areaServed":137,"knowsAbout":158,"sameAs":166},[46,89],"GeneralContractor","ÇET Yapı Turizm A.Ş.",[92,93,94],"ÇET Yapı","Çet Yapı","CET Yapi","ÇET YAPI TURİZM ANONİM ŞİRKETİ",[97,101],{"@type":98,"propertyID":99,"value":100},"PropertyValue","MERSİS","0242051074500011",{"@type":98,"propertyID":102,"value":103},"İstanbul Ticaret Sicil No","818550-0",{"@type":105,"credentialCategory":106,"name":107,"recognizedBy":108},"EducationalOccupationalCredential","license","Yapı Müteahhitliği Yetki Belgesi – E grubu (No 0034211566204056)",{"@type":109,"name":110},"GovernmentOrganization","T.C. Çevre, Şehircilik ve İklim Değişikliği Bakanlığı",{"@type":112,"url":113},"ImageObject","https:\u002F\u002Fwww.cetyapi.com.tr\u002Fimages\u002Ftheme\u002Fcet-yapi-logo.png","Founded in Istanbul in 1993, ÇET Yapı is a Turkish contractor delivering turnkey school campuses, housing, urban transformation, design and restoration.","1993",{"@type":117,"name":118},"Person","Doç. Dr. Ahmet Çetinsaya","info@cetyapi.com.tr","+902126623000",{"@type":122,"streetAddress":123,"addressLocality":124,"addressRegion":125,"addressCountry":126},"PostalAddress","Çobançeşme Mah. Sanayi Cad. No:44 Nish İstanbul Residence D Blok D:186 Yenibosna","Bahçelievler","İstanbul","TR",{"@type":128,"dayOfWeek":129,"opens":135,"closes":136},"OpeningHoursSpecification",[130,131,132,133,134],"Monday","Tuesday","Wednesday","Thursday","Friday","09:00","18:00",[138,141,143,146,148,150,152,154,156],{"@type":139,"name":140},"Country","Türkiye",{"@type":142,"name":125},"City",{"@type":144,"name":145},"AdministrativeArea","Beşiktaş, İstanbul",{"@type":144,"name":147},"Kadıköy, İstanbul",{"@type":144,"name":149},"Sarıyer, İstanbul",{"@type":144,"name":151},"Bakırköy, İstanbul",{"@type":144,"name":153},"Üsküdar, İstanbul",{"@type":144,"name":155},"Şişli, İstanbul",{"@type":144,"name":157},"Bahçelievler ve Güngören, İstanbul",[159,160,161,162,163,164,165],"School construction","Educational campus construction","Urban transformation","Real estate development","Architectural design","Historic building restoration","Turnkey construction",[167,168],"https:\u002F\u002Fwww.instagram.com\u002Fcet_yapi\u002F","https:\u002F\u002Fx.com\u002FCetYapi",{"title":25,"html":170,"toc":171,"tldr":193,"faq":198,"sources":204,"image":14,"imageAlt":214,"published":215,"publishedIso":16,"modified":216,"modifiedIso":16,"reading":217,"related":218,"more":228,"urbanCta":241},"\u003Cp>The first and most important step of urban transformation in Turkey is the \u003Cstrong>risky building assessment\u003C\u002Fstrong> (\u003Cem>riskli yapı tespiti\u003C\u002Fem>). Rent assistance, the \u003Ca href=\"\u002Fen\u002Fblog\u002Fyarisi-bizden-half-from-us-campaign-istanbul\u002F\">Yarısı Bizden\u003C\u002Fa> campaign, tax and fee exemptions and majority decision-making all depend on it. Below is the process under Articles 7 and 8 of the Implementing Regulation of Law No. 6306.\u003C\u002Fp>\n\u003Ch2 id=\"what-is-a-risky-building\">What is a risky building?\u003C\u002Fh2>\n\u003Cp>A building that has completed its economic life or is shown by scientific and technical data to be at \u003Cstrong>risk of collapse or heavy damage\u003C\u002Fstrong>. The assessment follows the \u003Cem>Principles for Determining Risky Buildings\u003C\u002Fem> annexed to the regulation and uses the Ministry&#39;s software. Unoccupied buildings under construction and derelict buildings are not assessed.\u003C\u002Fp>\n\u003Ch2 id=\"who-orders-it-and-where\">Who orders it and where?\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Cstrong>Primarily the owners or their legal representatives\u003C\u002Fstrong>, at their own cost.\u003C\u002Fli>\n\u003Cli>Applications go to \u003Cstrong>Ministry-licensed institutions\u003C\u002Fstrong>; the request is registered in the Ministry&#39;s \u003Cstrong>electronic system\u003C\u002Fstrong>.\u003C\u002Fli>\n\u003Cli>The Directorate or municipality may also act \u003Cstrong>ex officio\u003C\u002Fstrong> or require owners to act within a deadline; owners then bear the costs pro rata.\u003C\u002Fli>\n\u003Cli>If no assessment is made within \u003Cstrong>2 months\u003C\u002Fstrong> of registration, the record can be deleted at an owner&#39;s request (ex officio after \u003Cstrong>6 months\u003C\u002Fstrong>).\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2 id=\"how-is-it-carried-out\">How is it carried out?\u003C\u002Fh2>\n\u003Cp>The institution surveys the building, takes \u003Cstrong>concrete core samples\u003C\u002Fstrong> from columns and walls, inspects reinforcement and analyses the data in the Ministry&#39;s software. If access is refused, it can proceed \u003Cstrong>with police assistance\u003C\u002Fstrong> with the district governor&#39;s permission. As a rule \u003Cstrong>only one report\u003C\u002Fstrong> may be issued per building, so choose the institution carefully.\u003C\u002Fp>\n\u003Ch2 id=\"timeline-from-assessment-to-final-decision\">Timeline from assessment to final decision\u003C\u002Fh2>\n\u003Cdiv class=\"table-responsive\">\u003Ctable class=\"table table-striped table-hover\">\n\u003Cthead>\n\u003Ctr>\n\u003Cth>Step\u003C\u002Fth>\n\u003Cth>Rule\u003C\u002Fth>\n\u003C\u002Ftr>\n\u003C\u002Fthead>\n\u003Ctbody>\u003Ctr>\n\u003Ctd>Report sent to the Directorate\u003C\u002Ftd>\n\u003Ctd>Via the electronic system\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Returned if incomplete\u003C\u002Ftd>\n\u003Ctd>Institution corrects within 30 days\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Land registry annotation\u003C\u002Ftd>\n\u003Ctd>\u003Cstrong>Within 10 working days\u003C\u002Fstrong> if complete\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Notification\u003C\u002Ftd>\n\u003Ctd>Posted on the building, \u003Cstrong>e-Government\u003C\u002Fstrong> notice, \u003Cstrong>15 days\u003C\u002Fstrong> at the neighbourhood office\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Deemed served\u003C\u002Ftd>\n\u003Ctd>Last day of the neighbourhood notice\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Objection\u003C\u002Ftd>\n\u003Ctd>\u003Cstrong>15 days\u003C\u002Fstrong> from the last day of the notice\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003Ctr>\n\u003Ctd>Demolition period\u003C\u002Ftd>\n\u003Ctd>Authority sets \u003Cstrong>up to 90 days\u003C\u002Fstrong>\u003C\u002Ftd>\n\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003C\u002Fdiv>\u003Cp>The result is recorded in the declarations section of the title deed, commonly called the &quot;risky building note&quot;. You can check a building&#39;s status through the Ministry&#39;s service on e-Government.\u003C\u002Fp>\n\u003Ch2 id=\"objections-and-lawsuits\">Objections and lawsuits\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Cstrong>Objection:\u003C\u002Fstrong> owners or legal representatives (heirs, if deceased) petition the Directorate within \u003Cstrong>15 days\u003C\u002Fstrong>; a technical board decides. Late objections are not processed.\u003C\u002Fli>\n\u003Cli>\u003Cstrong>Lawsuit:\u003C\u002Fstrong> administrative acts under Law No. 6306 can be challenged within \u003Cstrong>30 days of notification\u003C\u002Fstrong>.\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch2 id=\"after-the-assessment-demolish-or-retrofit\">After the assessment: demolish or retrofit?\u003C\u002Fh2>\n\u003Cp>Once final, owners must vacate and demolish within the period given (max. 90 days). Within that period they may instead choose \u003Ca href=\"\u002Fen\u002Fblog\u002Fseismic-retrofit-or-rebuild-turkey\u002F\">seismic retrofitting\u003C\u002Fa>, provided it is technically feasible, decided by the owners, designed and permitted. See the next steps in our \u003Ca href=\"\u002Fen\u002Fblog\u002Furban-transformation-process-step-by-step-turkey\u002F\">urban transformation process guide\u003C\u002Fa>.\u003C\u002Fp>\n\u003Ch2 id=\"working-with-cet-yapi\">Working with ÇET Yapı\u003C\u002Fh2>\n\u003Cp>For buildings with a final risky building decision, ÇET Yapı handles feasibility, design and construction. Fill in our \u003Ca href=\"\u002Fen\u002Furban-transformation\u002F#on-basvuru\">pre-application form\u003C\u002Fa> to get started.\u003C\u002Fp>\n\u003Cp>\u003Cem>This article is general information; consult a lawyer in disputes.\u003C\u002Fem>\u003C\u002Fp>\n",[172,175,178,181,184,187,190],{"id":173,"text":174},"what-is-a-risky-building","What is a risky building?",{"id":176,"text":177},"who-orders-it-and-where","Who orders it and where?",{"id":179,"text":180},"how-is-it-carried-out","How is it carried out?",{"id":182,"text":183},"timeline-from-assessment-to-final-decision","Timeline from assessment to final decision",{"id":185,"text":186},"objections-and-lawsuits","Objections and lawsuits",{"id":188,"text":189},"after-the-assessment-demolish-or-retrofit","After the assessment: demolish or retrofit?",{"id":191,"text":192},"working-with-cet-yapi","Working with ÇET Yapı",[194,195,196,197],"The assessment is ordered primarily by the owners or their legal representatives, at their own cost, from a Ministry-licensed institution; the request is registered in the Ministry's electronic system.","As a rule only one risky building report can be issued per building; the Provincial Directorate reviews it and, if complete, notifies the land registry within 10 working days.","The decision is posted on the building, sent to owners via e-Government and displayed at the neighbourhood office for 15 days; objections can be filed within 15 days after that.","Once final, the authority gives owners up to 90 days to vacate and demolish; administrative acts under Law No. 6306 can be challenged in court within 30 days of notification.",[199,200,201,202,203],{"q":67,"a":70},{"q":72,"a":74},{"q":76,"a":78},{"q":80,"a":82},{"q":84,"a":86},[205,208,211],{"title":206,"url":207},"Implementing Regulation of Law No. 6306, Articles 7 and 8","https:\u002F\u002Fwww.mevzuat.gov.tr\u002Fmevzuat?MevzuatNo=16849&MevzuatTur=7&MevzuatTertip=5",{"title":209,"url":210},"Law No. 6306 on the Transformation of Areas under Disaster Risk","https:\u002F\u002Fwww.mevzuat.gov.tr\u002Fmevzuat?MevzuatNo=6306&MevzuatTur=1&MevzuatTertip=5",{"title":212,"url":213},"Marmara Urban Transformation Directorate – Risky building process","https:\u002F\u002Fistanbulakdm.csb.gov.tr\u002Friskli-yapi-sureci-i-104407","Yeşilköy Akören apartment building by ÇET Yapı","1 October 2026",null,"3 min read",[219,222,225],{"href":220,"title":221},"\u002Fen\u002Fprojects\u002Fyesilkoy-ates-sitesi\u002F","Yeşilköy Ateş Residence",{"href":223,"title":224},"\u002Fen\u002Fprojects\u002Fyesilkoy-akuren-apartment\u002F","Yesilkoy Aküren Apartment",{"href":226,"title":227},"\u002Fen\u002Fprojects\u002Fbesiktas-geo-college\u002F","Beşiktaş Geo College",[229,232,235,238],{"href":230,"title":231},"\u002Fen\u002Fblog\u002Furban-transformation-in-bakirkoy-yesilkoy-florya-atakoy\u002F","Urban Transformation in Bakırköy: Yeşilköy, Florya, Ataköy and Kartaltepe (2026 Guide)",{"href":233,"title":234},"\u002Fen\u002Fblog\u002Fwill-my-flat-shrink-in-urban-transformation-turkey\u002F","Will My Flat Get Smaller in Urban Transformation? Land Share, Floor Area Ratio and m² (2026)",{"href":236,"title":237},"\u002Fen\u002Fblog\u002Finherited-shared-and-mortgaged-flats-in-urban-transformation-turkey\u002F","Inherited, Co-Owned and Mortgaged Flats in Urban Transformation: How Does It Work? (2026)",{"href":239,"title":240},"\u002Fen\u002Fblog\u002Furban-transformation-in-besiktas-etiler-levent-ulus\u002F","Urban Transformation in Beşiktaş: Etiler, Levent, Ulus and the Bosphorus Area (2026 Guide)","\u002Fen\u002Furban-transformation\u002F#on-basvuru",{"\u002Fimages\u002Fuploads\u002F2025\u002F04\u002Fyesilkoy-akuren-apartmani-img-02.jpg":243},[244,245],800,600,{"home":20,"corporate":247,"projectTypes":266,"allProjects":279,"news":280,"blog":23,"contact":281,"urban":284,"legal":286,"legalPages":302,"languages":303},[248,251,254,257,260,263],{"href":249,"title":250},"\u002Fen\u002Fabout-us\u002F","About Us",{"href":252,"title":253},"\u002Fen\u002Fchairmans-message\u002F","Chairman's Message",{"href":255,"title":256},"\u002Fen\u002Four-mission-and-vision\u002F","Our Mission and Vision",{"href":258,"title":259},"\u002Fen\u002Fhistory\u002F","History",{"href":261,"title":262},"\u002Fen\u002Fquality-policy\u002F","Our Quality Policy",{"href":264,"title":265},"\u002Fen\u002Fhuman-resources\u002F","Human Resources",[267,270,273,276],{"href":268,"title":269},"\u002Fen\u002Fproject-type\u002Fcontracting-services\u002F","Contracting Services",{"href":271,"title":272},"\u002Fen\u002Fproject-type\u002Freal-estate-development\u002F","Real Estate Development",{"href":274,"title":275},"\u002Fen\u002Fproject-type\u002Farchitectural-project\u002F","Architectural Project",{"href":277,"title":278},"\u002Fen\u002Fproject-type\u002Frenovation-restoration\u002F","Renovation Restoration","\u002Fen\u002Fprojects\u002F","\u002Fen\u002Fcategory\u002Fnews\u002F",{"href":282,"title":283},"\u002Fen\u002Fcontact-us\u002F","Contact Us",{"href":285,"title":53},"\u002Fen\u002Furban-transformation\u002F",[287,290,293,296,299],{"href":288,"title":289},"\u002Fen\u002Fcookie-policy\u002F","Cookie Policy",{"href":291,"title":292},"\u002Fen\u002Furban-transformation-pre-application-privacy-notice\u002F","Urban Transformation Pre-Application Form Privacy Notice",{"href":294,"title":295},"\u002Fen\u002Fcommercial-electronic-message-consent\u002F","Commercial Electronic Message Consent",{"href":297,"title":298},"\u002Fen\u002Fpersonal-data-retention-and-destruction-policy\u002F","Personal Data Retention and Destruction Policy",{"href":300,"title":301},"\u002Fen\u002Fprivacy-and-security-policy\u002F","Privacy and Security Policy",{"cerez-politikasi":288,"kentsel-donusum-aydinlatma-metni":291,"ticari-elektronik-ileti-onayi":294,"kisisel-veri-saklama-ve-imha-politikasi":297,"gizlilik-ve-guvenlik-politikasi":300},[304,307,309,313],{"code":305,"label":126,"home":306},"tr","\u002F",{"code":5,"label":308,"home":20},"EN",{"code":310,"label":311,"home":312},"ar","AR","\u002Far\u002F",{"code":314,"label":315,"home":316},"ru","RU","\u002Fru\u002F",1793451807037]